ACTIVITY

CONTROL TOOL

RESPONSIBLE PERSON

After receiving all necessary material, approvals, confirmations and go-aheads like sealer sample, ORA, PORA and final corrected pattern, the factory R&D team starts working on 2 pcs to ensure process perfection till bulk stage. Internal lab testing includes shrinkage, dry/wet color fastness.

Production File including H.O. R&D Report

Factory R&D Incharge and Factory Production Merchant

Based on R&D team's review of 2 pcs and lab reports (pre & post wash), Factory Head and Quality Head decide to schedule internal PPM.

Factory 2 pcs R&D Report, Lab Test Report

R&D Incharge and Factory Production Merchant

If result is negative, root cause analysis is done and corrected.

R&D Incharge and Factory Production Merchant

Factory Merchant confirms all bulk material is in-house and arranges Internal PPM. Attendees include GM, QAM, H.O. Merchant, Lab Tech, etc.

PPM Report (Internal)

Factory Production Merchant

External PPM is arranged with full team after internal PPM is documented. Buyer’s instructions must be clarified.

PPM Report (Internal & External)

Factory Production Merchant

Trial run of 200 pcs is done as per OB Sheet. AQM deputes Line QC and Checkers.

PPM Report (Internal & External)

AQM

AQM sets line using all quality tools like SPI mock, mock cards, maintenance cards etc.

Display Mocks and Instructions

AQM & Line QC

End-line table displays OB sheet, sealed sample, trims card, checking instructions, measurement sheet, etc.

All Mentioned Documents

AQM & Line QC

Endline checker checks 100% garments and prepares hourly reports.

Inline Checking Report and Hourly Production Report

Endline Checker and Line Supervisor

AQM checks 5 pcs of output vs. PPM. Washed samples are reviewed. If deviation is within range, go-ahead is given for bulk.

AQM 5 pcs Review Report

AQM and Line Supervisor

Endline Checker gives 4 pcs measurement report hourly. Line QC reports every 2 hrs. AQM reports daily. QAM compares results.

4pcs Report (Checker, Line QC, AQM)

Endline Checker, Line QC, AQM

After specs & visual OK, NQC performs line walk and recommends corrections.

Initial Review Report

NQC and AQM

Post-NQC corrections, Endline Checker reviews pcs. AQL-1.5 audit done. Passed lot dispatched to I/R.

Floor Audit Report & Challan

AQM Stitching & I/R Incharge

If Kaj/Button required, I/R Incharge takes first piece approval from Production Merchant & QAM.

Dispatch Challan

I/R Incharge

AQM Finishing provides thread cutting instructions and marks cut areas on mock sample.

Thread Cutting Instructions

AQM Finishing

10 pcs sent post-thread cutting to wash. Hand feel & wash quality approved by QAM & Production Merchant.

Approved Standard

Finishing Manager

Final wash recipe locked by Washing Manager after approval.

Wash Recipe

Washing Manager

First 25 pcs checked post-wash for ironing standard. AQM must approve ironing stage.

AQM Measurement Review Report

AQM Finishing

Guidelines set for ironing, re-ironing, spotting, handling, etc.

Guidelines and Instructions

AQM Finishing

AQM verifies Measurement Checker’s report and checks final presentation

Measurement Checker’s Report

AQM Finishing

Final garments go for size tag, wash care check, tagging, and thread sucking (if needed). Then AQL-1.5 audit before packing.

Endline Auditor Report

Endline Auditor & AQM Finishing

Metal detector operator performs calibration every 2 hrs. Maintains hourly pass record. Japan requires 4 passes per garment.

Hourly Metal Detection Record

Metal Detector Operator & AQM Finishing

Packing Incharge takes folding approval, ensures tagging & packaging meets PO/country specs.

Merchant’s Approval

Packing Incharge & Factory Production Merchant

Final shipment audited by NQC. If passed, it is offered to Buying QA. After approval, shipping is initiated.

NQC & Buying QA Audit Report

NQC and Buying QA

Container checked by NQC, Finishing Manager, and Packing Incharge. Must match PO/destination specs.

Container Condition Report

NQC, Packing Incharge, Finishing Manager

Request A Call Back

Ever find yourself staring at your computer screen a good consulting slogan to come to mind? Oftentimes.

    Optimizing garment manufacturing with sustainable solutions, enhancing quality, and maximizing efficiency.

    Information

    Instagram Posts

    Copyright © 2025 Rudra Sustainable Solutions | All Right Reserved Developed by Apogix.

    Newsletter SignUp!